48
PRDCAM AHU Communication Kit Installation Manual
Due to our policy of continuous product innovation, some specications may change without notication.  
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG” is a registered trademark of LG Corp.
EEV KIT INSTALLATION
7-1/2 inches
Ø1/4”
13-5/16 inches
Mounting the PRLK048A0/
PRLK096A0 EEV Kit
1.  Remove the Top Panel by unscrewing the screws 
at the four (4) corners.
2.  Using the Bottom Panel as a template, mark the 
location on the wall or ceiling where the holes 
for the screws should be placed. Drill the four (4) 
holes.
3.  Attach the EEV Bottom Panel securely using four 
(4) field-supplied 1/4 inch long screws.
Figure 20: Removing the Screws.
Figure 21: EEV Bottom Panel 
                 Hole Dimensions.
Mounting the EEV Kit
Mounting the PRLK396A0 / PRLK594A0 EEV Kit
1. Remove the two screws
    from the EEV kit base plate
3. Remove the four screws
    from the cover plate
4. Remove the cover plate 5. Drill holes in the correct locations
    and use 4 field-provided screws
    to secure the EEV kit.
Model
length (inch)
A B
PRLK396A0
10-3/4 7-1/2
2. Remove the base plate.
A
Pipe diameter 5/8”
B
Hole
size
1/4”
Pipe diameter 5/8”
PRLK594A0
10-3/4 7-1/2