8. Installation
• Please read this instruction sheet completely before installing the product.
• When the power cord is damaged, replacement work shall be performed by authorized personnel only.
• Installation work must be performed in accordance with the national wiring standards by authorized personnel only.
Required Parts Required Tools
• Installation Plate 
• Four Type “A” screws
• Connecting cable
• Level  
• Screw driver 
• Electric drill
• Hole core drill (ø70mm) 
• Pipes: Gas side ..........Ø9.52, Ø12.7, Ø15.88mm
Liquid side.............................................Ø6.35mm
• Insulated drain hose
• Insulation materials 
• Flaring Tools set
• Specified Torque Wrenches
1.8kg·m...........................Liquid side piping
5.5kg·m .............................Gas side piping
Spanner .....................................Half union
• Specified Torque Wrenches
1.8kg·m...........................Liquid side piping
5.5kg·m..............................Gas side piping
• Hexagonal Wrench (4mm)
• Gas-leak Detector
• Two type “B” screws  • Owner’s Manual 
• Thermometer 
Installation Plate (VB, 2pcs)
-1 Installation Plate (VE, 1pc)
Washer Bolt (M8 L25, 4pcs, type "A")
Floor Mount Bracket (1pcs)
Drain Hose, Insulated
Drain Hose Hanger and screw
Suspension Bolt
Bolts for Mount Bracket
Connecting Tube(mm)
• Gas side : Ø12.7, Ø15.88
• Liquid side : Ø6.35
Connecting Cable
Drain Hose Extended
Installation Parts Provided
The other Installation Parts Needed