Service Manual 93
MPS Inverter SINGLE A
8.2 Settlement of outdoor unit
Anchor the outdoor unit with a bolt and nut(ø10mm) tight-
ly and horizontally on a concrete or rigid mount.
When installing on the wall, roof or rooftop, anchor the
mounting base securely with a nail or wire assuming the
influence of wind and earthquake.
In the case when the vibration of the unit is conveyed to
the hose, secure the unit with an anti-vibration rubber.
AUUW4860 [UU48 WUYB]/A
UUW6060 [UU60 WUYB]
Bolt
Tubing connection
Individual installation
Example of collective installation
500±2
500±2
500
500±2 500±2
700±2
250
556
250
556
Installation foot
8.3 Lifting Method
When carrying the unit suspended, pass the ropes
under the unit and use the two suspension points each
at the front and rear.
Always lift the unit with ropes attached at four points so
that impact is not applied to the unit.
Attach the ropes to the unit at an angle of 40° or less.
Use two ropes at least 7 m long.
Caution:
Be very careful to carry product.
Do not have only one person carry product if it is more than 20 kg.
PP bands are used to pack some products. Do not use them as a mean for transportation because they are
dangerous.
Do not touch heat exchanger fins with your bare hands. Otherwise you may get a cut in your hands.
Tear plastic packaging bag and scrap it so that children cannot play with it. Otherwise plastic packaging
bag may suffocate children to death.
When carrying in outdoor unit, be sure to support it at four points. Carrying in and lifting with 3-point support
may make outdoor unit unstable, resulting in a fall of it.
40° or less
Rope suspension part
B
A