9 Maintenance
Maintenance and annual startup
Table 9A Scheduled Maintenance Actions
Interval Maintenance
Weekly
Double-Wall Only: Check plate packs for leakage.
Quarterly
Every 3 months, check the operation of the over-temp switch in the electronic
control system control box.
Quarterly / Semi-
Annually
After the first 3 months, check the operation of the control valve in the boiler
water piping. Then check operation every 6 months.
Semi-Annually
Every 6 months, check the strainers on both the boiler water and domestic water
piping side.
Annually
Once each year, check the temperature sensors.
Once each year, check the operation of the recirculation pump.
Periodic
Periodic cleaning of the heat exchanger may be necessary, depending on
conditions and settings.
27
The IPW water heater requires regular routine maintenance to keep the unit operating at optimum efficiency. Lochinvar
recommends that the tasks listed in Table 9A - Scheduled Maintenance Actions, be performed at the periodic intervals specified.
Indirect Plate Water Heater Installation & Service Manual
NOTICE
For specific maintenance instructions reference the CD provided with the IPW.

Table of Contents

Other manuals for Lochinvar 100 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Lochinvar 100 Series and is the answer not in the manual?

Lochinvar 100 Series Specifications

General IconGeneral
BrandLochinvar
Model100 Series
CategoryWater Heater
LanguageEnglish

Related product manuals