EasyManua.ls Logo

LockMaster LM902 - Preparation for Installation

Default Icon
33 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
Preparation for Installation
The proper position of the post brackets is a decisive factor to the efficiency and leverage of the gate opener. The
distance (usually it is 2.5cm /1 inch or more) between the gate opener and the gate is also determined by the
proper position of the post brackets.
REV 09a

Related product manuals