Before start-up
LORCH
11
Before start-up
---------------------------------~~~---------------~-----------------------------
11
.1 Fasten transportation belt
2
Fig.
2:
Transporta
tion belt
2 Ca
rry
ing belt
12
Pl
as
tic
sli
der
13 Velcro fastener
11
.2 Fastening accessories
be
lt
r1
_ _
~
I
L·
'
~~
, / I / 1
I
~/
'
_,
I
Fig. 3: Accessories belt
5 Accessor
ie
s
be
lt with fastener
12 Plastic slider
14 Closure
10.13
13
~ Thread the transportation
be
lt into the welding ma-
chine and plastic slides.
See sequence of the num-
bering in
th
e picture.
14
~
Thread
the
accesso
ri
es belt into the handle and plas-
tic slides.
See sequence
of
the numbering
in
the
pi
c-
ture.
~
Plug the belt fasteners together.
- 7 -