EasyManua.ls Logo

LS Industrial Systems GLOFA GM7U Series - 10.3 Periodic Inspection

LS Industrial Systems GLOFA GM7U Series
367 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 10. Maintenance
10-2
10.3 Periodic Inspection
Check the following items once or twice every six months, and perform the needed corrective actions.
Check Items Checking Methods Judgment Countermeasure
Ambient
temperature
0 ~ 55 °C
Ambient Humidity 5 ~ 95%RH
Ambient
Environment
Ambience
-. Measure with thermometer
and hygrometer
-. measure corrosive gas
There should be no
corrosive gases
Adjust to general standard
(Internal environmental standard
of control section)
Looseness,
Ingress
The module should be move
the unit
The module should be
mounted securely.
PLC
Conditions
dust or foreign
material
Visual check No dust or foreign material
Retighten screws
Loose terminal
screws
Re-tighten screws Screws should not be loose Retighten
Distance between
terminals
Visual check Proper clearance Correct
Connecting
conditions
Loose connectors Visual check
Connectors should not be
loose.
Retighten connector mounting
Screws
Line voltage check
Measure voltage between
input terminals
*85 ~ 264V AC
*10.2 ~ 28.8V DC
Change supply power
Fuse Visual check No melting disconnection
If fuse melting disconnection,
change the fuse periodically
because a surge current can
cause heat

Table of Contents

Related product manuals