EasyManua.ls Logo

Lunos Nexxt - Surface Mounting Installation Steps; Positioning and Core Bore Creation; Cable Preparation and Routing; Wall Breakthrough Pipe Mounting

Lunos Nexxt
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
36
Installation - Surface mounting EN
Stipulate the positions of the dow-
el fixing of the wall installation
housing and the position of the
core bore of the wall break-
through pipe with the aid of the
drill template (= plaster protective
cover).
Manufacture the core bore for the
wall break-through pipe.
Drill the holes for the wall fas-
tening dowels.
Make available the mains cable
(and as appropriate, the control
lines).
Cable exit from the wall only in
the area marked on the drill tem-
plate.
Mount the wall break-through
pipe internally and externally with
slight protrusion for the bridging
of the plaster thickness! Keep to
the slope indicated in the illustra-
tion.
Clean the pipe externally.
Bore Ø: 8 mm
Core bore Ø:
162 mm
Cable exit
Mains cable
and control line
exit admissible
in this area
only
inner
outer
Plaster protective
3 mm

Related product manuals