4.1 Choice of commissioning .......................................4-1
4.2 Serial commissioning .............................................4-2
4.3 Voltage Frequency Control (VFC) ............................4-5
4.4 Sensorless Flux Control (SFC) ................................4-9
4.5 Field-Oriented Regulation (FOR)............................4-13
4.6 Operation with K
EYPAD KP200 ...............................4-18
4.7 Operation with D
RIVEMANAGER ...............................4-21
4.8 Parameter list (selection) .....................................4-22
Attention: Commissioning must only be carried out by qualified
electricians who have undergone instruction in the necessary
accident prevention measures.
4.1 Choice of com-
missioning
Typical applications Terminal assignment Commissioning/control mode Continued on
• Project planning and commissioning are
already complete.
• Loading of an existing data set.
Obtain the terminal
assignment from your
project engineer.
Serial commissioning page 4-2
• Pump, fan and extruder drivers and traction
drives with low dynamics
• Multi-motor operation
Assignment 1
see page 3-13
Voltage Frequency Control (VFC)
page 4-5
Assignment 2
see page 3-14
page 4-7
• Dynamic traction, lifting and rotational
drives
• Applications with dynamic load
surges
Assignment 1
see page 3-13
Sensorless Flux Control (SFC)
- Only for asynchronous motor
page 4-9
Assignment 2
see page 3-14
page 4-11
• Dynamic traction, lifting and rotational
drives with speed control
• With encoder feedback
Assignment 3
see page 3-15
Field-Oriented Regulation (FOR)
- Only for asynchronous motor
page 4-13
Assignment 4
see page 3-16
page 4-15
Selection