Pneumatic power supply
connection point
(1/4” 6 Bar)
The next step consists of machine connection to:
• Electric power supply (see chapter 14.1 )
• Pneumatic power supply ( see chapter 14.2 )
• Dust suction system
( attention, we strongly suggest to carefully follow the procedures described on chapter 14 )
Drilling set-up procedure please carefully follow the instructions described in chapter 15
Dust suction system
connection point
(Ø80 mm)
Electric power supply
connection point