EasyManua.ls Logo

Malvern Instruments ZETASIZER - Installation

Malvern Instruments ZETASIZER
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Site requirements
21
Installation
The NanoSampler will initially have been commissioned by Malvern trained personnel.
This section indicates actions to undertake should you need to:
l
Move the instrument
l
Upgrade the computer
Moving the instrument
If it is necessary to move the system, please contact Malvern Instruments for guidance.
Warning! Removal of the covers by unauthorized personnel will invalidate the
warranty of the instrument.
Note: If the original setup was performed as part of an IQ/OQ, moving the sys-
tem invalidates this.
Note:Only install the system in a suitable environment as detailed in Envir-
onmental conditions in the Site Requirements.
If you need to lift the system, follow this procedure:
1. Lift the NanoSampler using both hands at the marked positions which are at the
top of the instrument:

Related product manuals