EasyManua.ls Logo

Manitou 150 AETJ C - Page 91

Manitou 150 AETJ C
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-17
B4 - TIGHTENING ELECTRIC POWER CABLES
CHECK
- Make sure that the circuit connectors and various components of the power bundle are tight (Fig. B4/1).
B5 - OVERLOAD SENSORS
CHECK
Fold the arms into transport position for this operation.
- Place a higher weight than that indicated in the basket (see: 2 - DESCRIPTION: SPECIFICATIONS).
- The movements for extending the telescope and raising the arms should be blocked (the tilt indicator light is lit in the basket and the
buzzer is activated continuously in the basket).
In the event of a malfunction occurring, prevent the lifting platform from being used. Contact your dealer.
-
+
+
-
D1
S
B+
E2
A
B-
F1
F2
E1
A1
A2
A1
A2
E2 E1
A1
B 4/1
647536 (10/04/2017)
150 AETJ C / 170 AETJ L

Other manuals for Manitou 150 AETJ C

Related product manuals