B4 - TIGHTENING ELECTRIC POWER CABLES
CHECK
- Make sure that the circuit connectors and various components of the power bundle are tight (Fig. B4/1).
B5 - OVERLOAD SENSORS
CHECK
Fold the arms into transport position for this operation.
- Place a higher weight than that indicated in the basket (see: 2 - DESCRIPTION: SPECIFICATIONS).
- The movements for extending the telescope and raising the arms should be blocked (the tilt indicator light is lit in the basket and the
buzzer is activated continuously in the basket).
In the event of a malfunction occurring, prevent the lifting platform from being used. Contact your dealer.
-
+
+
-