7 Placing into operation
Operating and Installation Instructions UL 59
7.1 Procedure for Placing the Unit into Operation
Meaning
This section is intended to provide commissioning staff with an overview of the prerequisites that must
be met before placing the combi ovens into operation, as well as with information on how to place
them into operation.
Prerequisites
The following prerequisites must be met:
You must have familiarized yourself with the work listed in the combi oven’s operating manual and,
in particular, with the hazards involved in operating the unit.
Additional checks before placing the units into operation
Before putting the combi ovens into operation, and in addition to the prerequisites listed in the combi
oven installation manual’s 'Placing Into Operation, Removal from Service, and Disposal' section, check
to make sure that the following prerequisites are met:
You have used the required supply air and exhaust ducts for the bottom unit.
You have checked the connection cable and its routing.
You have connected the units to a grounding system.
You have checked the supply water and wastewater systems’ routing.
You have checked the cleaning agent tubes’ routing.
You have checked that the fans are connected correctly and are working properly.
You have checked that the door contact switch is working properly.
You have secured the units with a wall anchoring kit or with another method in order to ensure that
they will not move.
In the case of marine models: You have bolted or welded the bottom unit’s feet onto the floor.
In the case of stacking kits on casters: The casters’ brake and swivel locks are locked.
In gas units: You are using the required gas exhaust system.
In gas units: You have checked for gas leaks.
In gas units: You have checked the exhaust gas readings.
Do not place the units into operation unless all specified prerequisites are met.
Placing into operation
To place the combi ovens into operation, follow the steps in the combi oven’s installation manual.
Customer briefing
Tell the customer about the following safety and operation-relevant requirements and information:
When running the bottom unit at high temperatures for a prolonged time, the top unit should also be
turned on so that the fan cooling system will be activated.
The unit, the center adapter, the base frame, and the casters are fastened to each other.
The covers (both left side panels) are properly installed back in place.

Other manuals for Manitowoc convotherm 4

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc convotherm 4 and is the answer not in the manual?

Manitowoc convotherm 4 Specifications

General IconGeneral
BrandManitowoc
Modelconvotherm 4
CategoryKitchen Appliances
LanguageEnglish