Grove Published 4-09-2021, Control # 364-11 4-27
RT765E-2 OPERATOR MANUAL SET-UP AND INSTALLATION
4
9. Adjust the four counterweight leveling bolts
(Figure 4-24) to eliminate any relative movement
between the counterweight and the turntable.
The crane is now ready for operation with the counterweight
installed.
4
1
2
3
4
6 (4 places)
5
2
FIGURE 4-23
7
6670
Item Description
1 Valve Control Levers
2 Removal Cylinders
3 Cylinder Attach Pins
4 Counterweight Attach Pins
5 6740 kg (14,860 lb) Counterweight
6 Leveling Bolts (4 places)
7 Counterweight Lifting Lugs (4 places)
FIGURE 4-24
Leveling Bolts