60 Part Number: 040006847 12/19
4. Perform an ice production check using the formula
below.
1. Freeze Time + Harvest Time = Total Cycle Time
2.
1440 = Minutes
in 24 Hrs.
÷ Total Cycle Time = Cycles per Day
3.
Weight of One
Harvest
× Cycles per Day =
Actual 24-Hour
Production
Weighing the ice is the only 100% accurate check.
5. Compare the results of Step 3 with Step 2. Ice
production is normal when these numbers are within
10% of each other. If they match closely, determine if:
• Another ice machine is required.
• Relocating the existing equipment to lower the
load conditions is required.