EasyManua.ls Logo

Marine Air Systems vector compact - Installation Checklist (Review Prior to Installation); Quick Start Operations Checklist

Marine Air Systems vector compact
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
CHECKLIST
(review
prior
to
installation)
Seawater
cooling
system:
Speed
scoop
located
as
far
below
the
water
line
and
as
close
to
the
keel
as
possible
Shut
off
valve
and
speed scoop
properly
sealed
and
tight
Seawater
pump
is
at
least
one
foot
below
water
line
and
securely
mounted
Strainer
mounted
below
pump
with
access
to
filter
Double/reversed
stainless
steel
hose
clamps
on
all
hose
connections
Teflon
tape
on
all
threaded
connections
Hose
runs
uphill
from
speed
scoop
and
sea
cock
to
strainer,
pump
and
a/c
unit,
then
downhill
(if
possible)
from
a/c
unit
to
overboard
discharge
Water
flowing
freely
from
overboard
discharge
while
pump
is
running
Pump
relay
panel,
if
used,
must
have
its
own
circuit
breaker
sized
for
the
pump
(20
amp
max)
All
metal
fittings
should
be
bonded
Mounting
D
Not
in
engine
room
or
bilge
areas,
must
be
sealed
away
from
exhaust
or
fumes
Proper
spacing
allowed
around
unit
Attached
to
solid
level
platform
with
hold
down
clips
provided
Condensate
drain
routed
aft
and
down
hill
to
a
sealed
sump
(not
bilge)
Blower
rotated
toward
supply
air
grille
Electrical
All
butt
connections
on
pump
wire
tightly
crimped
and
heat
shrunk
AC
power
source
installed
and
grounded/bonded
in
accordance
with
ABYC
standards
Control
wires
connected
to
terminal
strip
with
fork
or
ring
terminals
Circuit
breakers
sized
according
to
specifications
on
the
data
plate
label
Passport
II
display
cable
is
connected
at
both
ends
Pump
Relay
Panel
(if
used)
has
a
dedicated
circuit
breaker
sized
for
the
pump
but
not
to
exceed
20
amps
maximum.
Grilles
and
Ducting
Supply
air
grille
mounted
as
high
as
possible
Return
air
grille
mounted
as
low
and
as
close
to
the
a/c
unit as
possible
Return
air
grille
mounted
away
from
bilge
vapors
or
exhaust
fumes
Ducting
is
pulled
taut,
straight,
smooth
and
properly
connected
with
no
excess
QUICK
START OPERATIONS
CHECKLIST
Ensure
seawater
intake
ball
valve
(seacock)
is
open.
Turn
on
the
A/C
circuit
breaker.
If
the
seawater
pump
has
its
own
circuit
breaker,
turn
that
on.
Turn
the
system
on.
Set
the
desired
cabin
temperature
(set
point).
Check
for
a
steady
solid
stream
of
water
from
the
overboard
discharge.
Verify
that
there
is
steady
airflow
out
of
the
supply
air
grille.
If
the
unit
does
not
appear
to
be
operating
properly,
refer
to
troubleshooting
guidelines.
Note:
Do
not
turn
the
unit
off
and
immediately
turn
it
back
on.
Allow
at
least
30
seconds
for
refrigerant
pressure
equalization.
12