EasyManua.ls Logo

Matsui DMS2-80 - Page 28

Matsui DMS2-80
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 3 Installation
- 24 -
Step
Item Task
2 Confirming
dehumidifying unit
condition
Please check the following units before lift and move the dehumidifying
unit main body.
Please make sure that eyebolts (4 pieces) on the device are fastened
as picture 24 shows.
Bolts with holes (4 pieces)
Picture 24
Make sure that the flat knob on the control board is installed. As picture
25 shows.
Picture 25
面把手
Flat knob
(with lock)

Related product manuals