Chapter 3 Installation
- 23 -
(2) Dehumidifying unit drying funnel separable type.
Step
Item Task
1
Installation
Install on the levelly stable floor.
As shown in figure22, make sure the installation location gives space to
perform maintenance.
600mm
600mm
600mm
600mm
Picture 22
2
Confirming
dehumidifying unit
condition
Remove adhesive tape covering regeneration exhaust port as shown in
Figure.
Picture 23
※Because of the difference of machine types and the positions of the
reclaim exhausts, please confirm type of the device main body.