CONTENTS
- II -
Page
Chapter 4 Preparation for Operation
1. Inspecting inside of the hopper ------------------------------------------------34
2. Condition confirmation of each unit and feeding of the resin --------------40
Chapter 5 Operating Procedures --------------------------------------------------------43
Chapter 6 Maintenance-------------------------------------------------------------------------44
Chapter 7 Alarms function -----------------------------------------------------------------50
Chapter 8 Troubleshooting ------------------------------------------------------------------52
Chapter 9 Technical manual
1. The shipment setting value for the controller ---------------------------------61
2. The start-up method for the auto tuning ------------------------------------------62
Chapter 10 Consumable Parts List
1. Machine parts---------------------------------------------------------------------------63
2. Electric parts------------------------------------------------------------------------63
Chapter 11 Specifications
1. Dehumidifying rotor specifications -----------------------------------------------64
2. Drying hopper specifications ------------------------------------------------------68
Chapter 12 Optional parts ------------------------------------------------------------------------69
Appendix
1. Circuit diagrams・Electric parts table---------------------------------------------70