EasyManua.ls Logo

Matsui DMS2-80 - Page 53

Matsui DMS2-80
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 6 Maintenance
- 49 -
5. Every six months maintenance
Maintenance item Description
Bolt and Nut
in each unit part
Check about whether there is not loosening of bolt and Nut at
each part of the unit. Then, perform rising fastens.
Rotor belt, Tension of
Spring plate
Check for any cracks, broken portion and tightness on the belt
and confirm the belt in case of any unusual function. Contact us
for belt replacement.
6. Every six months maintenance (Pleas contact my company)
Maintenance item
1 Examination of the reverse check function.
2 Examination of the blower thermal relay function.
3 Examination of the cracking status of electromagnetic switch (transducer
for blower motor), electromagnetic contactor (transducer for heater)
4 Examination of the thermocouple disconnection checks function.
5 Examination of the upper limit, lower limit and check function for the
drying temperature.
And other corresponding inspection

Related product manuals