Required installation places
Clean, bright and well ventilated place such as roof, balcony or courtyard.
Places without the interference of lampblack, steam and other kind of heat source.
Places where it is convenient for pipeline installation and water draining with the least
influence to surroundings, which is caused by noise and cool or heat wind.
Places close to electric power.
Places with solid basement to prevent noise and vibration.
Ensure there is sufficient space for maintenance, and the required room is shown as follow.
Query if there are any barriers that may block the airflow. The wall around the module
should be not higher than 1m (from the bottom of module). It is recommended to cover the
module to prevent from raindrop and snow, but the space between the cover and the top of
module should be more than 2m.
When installing modules in parallel, it is suggested to leave sufficient space among
modules for maintenance.
Installation foundation
Before installation, it should consider the structure and prefabrication of the basement,
especially when installing.
When stalling on the top floor or middle, the floor intensity and noise preventing should be
considered. It is preferable to communicate with building designer before installation.
The drainage channel must be made around the basement to ensure the water can be
drained away fluently.
In order to avoid the vibration and noise caused by module, a pad must be set between the
module and the basement to reduce vibration. Moreover, the module should be installed
on the plane, and a shockproof basement can be adopted if necessary.
It is recommended to take some measures to prevent the movement caused by long-term
running, earthquake or typhoon.