IOM 686 AGZ 030A through 065A 37
Unit Set Points and Calibration
The control software is installed and tested by the factory before shipping. No periodic calibration of
the controller is necessary. All control and safety set points must be checked by the installing
contractor and adjusted as necessary before starting the unit.
The “setpoint” control knob adjusts the leaving water setpoint. The “Control Band” knob adjusts
the controller temperature control band. To set, divide the chilled water temperature range by the
number of unloading steps and add 0.5°F.
Optional Sensors
Optional sensor kits, available from the factory, can be installed in the field. The optional sensor kits
have the same characteristics as the leaving water sensor.
Field Wiring
Interconnecting wiring for the control panel may consist of the following:
115 VAC power wiring
Analog input signals
Digital input signals
Digital output signals
Communications to a personal computer
Power Wiring
The installing contractor provides the unit voltage power source, disconnect, fuses and necessary
wiring for these circuits. All wiring must conform to the National Electrical Code and applicable
local building codes. If the evaporator heater power source (120VAC) is supplied from a separate
external supply, remove wires 540 and 545 as indicated on the unit wiring diagram.
Power Supplies
There are several internal power supplies used by the controller and related circuitry. The regulated 5
VDC power is supplied by RSP1 and provides power to pressure transducers. Do not use this power
supply to operate external devices. A 24 VAC power supply is available for the alarm bell option.
Wire according to the unit wiring diagram.
Analog input signals
All sensors and transducers required for normal chiller operation are installed and wired at the factory.
All optional analog input signal wiring is provided by the installing contractor must be twisted,
shielded pair (Belden #8760 or equal). The optional demand limit and remote reset signals are 0 to
10VDC signals. The controlling range of the remote reset signal is from 2VDC to 10 VDC.
Digital input signals
Remote contacts for all digital inputs into the Global UNT controller must be dry contacts suitable for
the 24 VAC control signals from the control panel. Do not connect 120 VAC power to the digital
inputs or 24VAC from an external power source.
Remote Stop/Start
If remote stop/start control is selected, remove the jumper between terminals #140 and #141 on TB-7
and install the input between these terminals. When the remote stop/start switch is open, the controller
will be in the unoccupied mode.

Table of Contents

Other manuals for McQuay AGZ 065A

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the McQuay AGZ 065A and is the answer not in the manual?

McQuay AGZ 065A Specifications

General IconGeneral
BrandMcQuay
ModelAGZ 065A
CategoryChiller
LanguageEnglish

Related product manuals