EasyManua.ls Logo

MDC XT 10E - Solar Panels; Sealants; Canopy Lifting Mechanism; Roof Skirt Elastic Cord

MDC XT 10E
111 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.marketdirect.com.au
I
Ph: 1300 494 494 I Contents 47
Solar Panels
Accumulated dirt and soiling can affect the performance of the solar panels. Panels should be cleaned as
necessary to prevent this. Sealants around solar panel mounts should be checked annually to ensure they are in
good condition.
Sealants
Roof sealants should be inspected every 6 months for condition. If the sealant has perished or adhesion has
failed it should be repaired immediately.
Canopy Lifting Mechanism
The canopy lift mechanism requires maintenance as per the maintenance schedule.
Yellow arrows indicate light lubrication with lanolin based lubricant. (Every 6 months)
Red arrow indicates protecting the spring with a lanolin based lubricant. (Every 12 months)
Roof Skirt Elastic Cord
The elastic cord surrounding the PVC roof skirt is placed to ensure the skirt pulls inward when lowering the roof.
This is an important function that protects the skirt from mechanical damage from the lifting mechanism and
getting pinched by the roof. Regular inspection and replacement when necessary is part of the maintenance
schedule. The illustrations below show the correct tension marked by a green and incorrect shown by the red X

Table of Contents

Related product manuals