MAC/MTT-OPS-1
26 FEB 2019
Appendix
MAC/MTT Operators Checklist
A-24
MAC/MTT-OPS(CL)-1
26 FEB 2019
2. Inspect tank interior to ensure it is clean, if the
tank is coated, ensure coating integrity, clean or
repair as required.
3. Install sump cover with new gasket.
4. Close all drain valves and petcocks.
5. Start engine.
6. Control SYSTEM/POWER Switch – ON
7. Individual Spray Head Switches – OFF
8. DUMP BAR Switch – OFF
9. DRAIN Switch – OFF
10. MONITOR/BFV Switch – OFF
11. Cab Control SYSTEM/POWER Switch – OFF
12. Turn engine off.