EasyManua.ls Logo

Megger MIT330 - Connection and Controls; Test Lead Connections

Megger MIT330
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Memory control keys:
STORE: Store initiates the storing of a test result.
LAST/NEXT: Selects the type of location; ie Job, distribution
board, circuit, phase etc.
ESC: Aborts a save at any time.
OK: Final operation to save the result.
s Selects the job, db, circuit number; ie 01,02,03 etc
t
Lid open/closure
1. Open lid by lifting up front panel tab (1).
2. Fold-away underneath instrument (2 & 3) and push into retaining slot
(4).
Connection Panel
MIT300 Series test lead connections
An interlock sliding panel prevents connection of unsafe test lead
configurations. (MIT320/MIT330 only)
MIT330 Additional Controls
7
MIT300_UG_en_V11.qxp 14/1/09 3:03 pm Page 7
www.netzerotools.com
www.netzerotools.com

Related product manuals