EasyManua.ls Logo

Mitsubishi Electric A173UHCPU - Page 249

Mitsubishi Electric A173UHCPU
389 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7. POSITIONING CONTROL
7 102
(3) Operation timing and speed-switching positions
The operation timing and positions for speed switching are shown below.
V
t
Axis 1 positioning
direction
Axis 2 positioning direction
20000
40000
20000 40000
10000
15000
Axis 1 start accept flag (M2001)
Axis 2 start accept flag (M2002)
All axes servo start command (M2042)
All axes servo start accept flag (M2049)
Start command (X000)
SVST instruction
PLC ready (M2000)
Speed-switching designation flag
(M2040)
P1
P2
P3
P4
Center
point

Table of Contents

Other manuals for Mitsubishi Electric A173UHCPU

Related product manuals