EasyManua.ls Logo

MIXER PLUS Series - Pre-Operation Checks

MIXER PLUS Series
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Manual instruction Mixer Plus Mixer Technology srl pag.22
CHECKS BEFORE SWITCHING ON
1) Make sure that there are not any non-authorized persons close to the
machine.
2) Make sure that the machine is braked and in horizontal plane.
3) Make sure that all components are properly installed.
4) Make sure that the main electric switch is in pos. “0” (off).
5) Make sure that the safety devices are integral, properly installed and
working.
6) Make sure that all shelves are correctly closed.
7) Make sure that the service taps and the system water drain are closed.
8) Make sure that the valve of the spraying nozzle is open.
9) Make sure that the plug of the power supply cable is connected to the plant
supplier and that the main electric switch is off.
10) Make sure that the air, water and material conveying tubes are well
stretched avoiding any constriction.
11) Make sure that the hopper drain door is closed.
12) Use the compulsory personal protective devices provided by own employer.
13) Verify the filter presence, if the water isn’t being drawn from water supply.