(Applicable to gear cases).
Check whether hooks are installed
correctly
Check tightening torque of the chain
guide mechanism; lock up plates and
chains with the torque specified in this
manual (applicable to tightening torque of
screws).
Check whether chains are distorted.
一旦完成这些检查,根据下列说明进行(准备随时按下紧急停止按钮)
对链条进行润滑然后开始空载运行链条一段时间。
空载运行时检查吊钩对应于控制箱上的箭头所指示方向上的动作。
检查制动器的运行:提起额定的负荷然后降低。
在您装有我们环链吊机的设备上用额定负荷的+10%进行动态测试然后用额定负荷的+25%进行静态测试。
Once these checks are performed, please operate according to following instructions (be ready to press the
emergency stop button any time).
After lubrication, the chains shall be operated without load for some time.
During load-free operations, check the movements of hooks along the
direction indicated by the arrowhead on the control box.
Check brake operations: Lift the rated load up and then reduce the load.
Dynamically test your devices equipped with our chain hoists with +10% of rated load, and statically test them with
+25% of rated load.
7.1
电气
在电气箱内进行任何操作前必须确认环链吊机的电源被断开。
隔离开关必须安装在距离环链吊机最远不超过6米的位置。
7.1 Electrical
Confirm whether the power supply of the chain hoist is disconnected before any operation inside
the electrical box.
The isolator switch must be installed not 6m away from the chain hoist.
7.1.1 电源连接
用户必须提供电源电缆、保险丝和电源隔离开关(参考配线图)。
检查确认环链吊机使用了正确的电源系统。