EasyManua.ls Logo

Motorline OL2000 - Installing Limit Switch Plates; Maintenance; Repairs

Default Icon
12 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Fig. 23 Fig. 24
8) MAINTENANCE
a) After having rack nstalled, take the gate back to the closed position and position the limit swicth plate
on the rack. In this closed position, the plate should trigger the limit switch of the motor.
b) Tighten the screws DIN912 M5x12 included in the pack, until it touches the rack, squeezing it.
c) Move the gate to the open position and repeat the same process for the other limit switch plate.
Carry out the following operations at least every 6 months.
- Check the eciency of the release system.
- Check the eciency of the safety devices and accessories.
9) REPAIRS
For any repairs, pls contact the authorised repair centers.
7.9. Installing limit switch plate
Pág. 10
DIN912
M5x10

Related product manuals