EasyManua.ls Logo

Motorola i897 - Page 61

Motorola i897
148 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PREPARING FOR FIELD LEVEL TESTING: Main Board Preparation (Continued)
Main Board Preparation (Continued)
Tools Required:
None Required
5. Apply the Kapton tape to the SIM Strap on the main board.
6. Assemble USB strap to the Main Board.
7. Assemble the SIM card strap and Contact EMI shield to the main board and press it to
activate the adhesive.
8. Assemble two Contact EMI shield to the point of main board.
3
1
4
2
6880401P59-O

Table of Contents

Other manuals for Motorola i897

Related product manuals