DehumidierML180-MLT350
4.3Foundation
Thedehumidiermustbeinstalledonaleveloor,oronaplatformcapableofsupportingthemachine
weight.Ifthemaximumoorloadingweightisnotexceeded,specialfoundationsarenotrequired.
Whenthedehumidierhasbeeninstalled,checkthatitislevel.
Iflocalregulationsrequirethattheunitispermanentlyxedinposition,thexingholescanbeusedfor
boltingtheunittotheoor.
Figure4.1Drillingpattern
4.4Mirrorhandedductconnections
Thefrontandrearpanelsareinterchangeable,sothattheconnectionsforprocessairanddryairmaybe
situatedeitherontheleftorrightsideoftheunit.
Thedehumidiersaredeliveredwiththeprocessanddryairconnectionsontheleftsideoftheunit.If
itisrequiredtochangetheorientation,sothattheconnectionsareontherightsideoftheunit,proceed
asfollows.
W W
W
ARNING! ARNING!
ARNING!
Makesurethatthedehumidierisdisconnectedfromthemainspowerbeforechangingthepositionsofthe
processairanddryairconnections.
8Installation190TGB-1034-L1604