EasyManua.ls Logo

NeoDen 3V - 3 Structure and Maintenance Instruction; Structure Chart; Peel Box

NeoDen 3V
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
31
3. Structure and maintenance instruction
3.1. Structure Chart
3.1.1. Peel Box
1) Fixation of Peel box
Fix the peel boxes on support bar and plug wires into connectors one by one.
And the ID of each peel box can be changed accordingly.
2) Load Cover Tape
Uplift the gear, while insert the cover tape into it and make sure the cover tape is flat but not kinked.

Related product manuals