EasyManua.ls Logo

NETGEAR ProSafe GS724TP - Chapter 4 Installation; Step 1: Preparing the Site

NETGEAR ProSafe GS724TP
41 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-13
v1.0, January 2007
Chapter 4
Installation
This chapter describes the installation procedures for your NETGEAR Smart Switch. Switch
installation involves the following steps:
Step 1: Preparing the site
Step 2: Installing the switch
Step 3: Checking the installation
Step 4: Connecting devices to the switch
Step 5: Installing an SFP GBIC module
Step 6: Apply AC power
Step 7: Switch management through a Web Brower or the PC Utility for initial configuration
Step 1: Preparing the Site
Before you installing the switch, ensure the operating environment meets the operating
environment requirements in the following table.
Table 4-1. Site Requirements
Characteristics Requirements
Mounting Desktop installations - Provide a flat table or shelf surface.
Rack-mount installations - Use a 17-inch (48.3-centimeter) EIA standard equipment
rack that is grounded and physically secure. The rack-mount kit supplied with the switch
is also required.
Access Locate the switch in a position that allows access to the front panel RJ-45 ports, view the
front panel LEDs, and access power connector.

Related product manuals