4-13
v1.0, January 2007
Chapter 4
Installation
This chapter describes the installation procedures for your NETGEAR Smart Switch. Switch
installation involves the following steps:
Step 1: Preparing the site
Step 2: Installing the switch
Step 3: Checking the installation
Step 4: Connecting devices to the switch
Step 5: Installing an SFP GBIC module
Step 6: Apply AC power
Step 7: Switch management through a Web Brower or the PC Utility for initial configuration
Step 1: Preparing the Site
Before you installing the switch, ensure the operating environment meets the operating
environment requirements in the following table.
Table 4-1. Site Requirements
Characteristics Requirements
Mounting • Desktop installations - Provide a flat table or shelf surface.
• Rack-mount installations - Use a 17-inch (48.3-centimeter) EIA standard equipment
rack that is grounded and physically secure. The rack-mount kit supplied with the switch
is also required.
Access Locate the switch in a position that allows access to the front panel RJ-45 ports, view the
front panel LEDs, and access power connector.