Newco LCD-TCH - Machine Startup Sequence; Filling, Heating, and Ready State

Newco LCD-TCH
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
Ensure
that
there
is
a
proper
water
supply
connected
to
the
machine
and water is turned on. Ensure that the machine is plugged into a
proper power outlet and there is power supplied to the machine. Turn
machine power switch on, machine should start filling, will shut off
when full. The Touch Screen Display will indicate when the machine is
filling.
Heater
will
turn
on
when
water
in
t
ank
is
at
probe
level
and
will
di
s
play
Heating: Please Wait. The heating process can take 10-15 minutes
before the machine is ready to brew.
When
machine
temperature
reaches
brew
temp,
display
will
change
to the Drink Selection Screen. The machine is now ready for
operation.
Machine Startup Instructions
Sleep screen appears when machine has been idle.
Touching the Sleep Screen will bring up the
Instruction Screen then the Drink Selection Menu