Inspection of the installation
Current regulations require the heating installation to be inspected before it is commissioned. The inspection must
be carried out by a suitably qualified person.
In addition, fill in the page for the installation data in the User Manual.
DateSigna-
ture
NotesDescription
Electrical connections
Communication, heat pump
Connected supply 230 V
Outside sensor
Room sensor
Temperature sensor, hot water char-
ging
Temperature sensor, hot water top
Temperature sensor, external flow
line
Temperature sensor, external return
line
Charge pump
Shuttle valve
AUX1
AUX2
AUX3
AUX4
AUX5
AUX6
AUX10
AUX11
Miscellaneous
Checking additional heater
Checking the function of the revers-
ing valve
Checking charge pump function
Completed installation check of heat
pump and associated equipment