49-FM200-OP-01 Issued 3/01
6
Daily Operations
To do this . . . Press this key . . . This happens . . . It means . . .
Turn on the power.
The POWER switch turns on. Power to the processor is
on.
Turn off the power. The POWER switch turns off. Power to the processor is
off.
Scan the temperatures
of each zone.
The MONITOR/SCAN
indicator turns on and stays
on.
The system scans each
heated zone and displays
each zone’s temperature.
Monitor the temperature
of a zone.
The MONITOR/SCAN
indicator stays on.
The system displays the
temperature of only the
zone currently selected.
Place the system in
standby.
The STANDBY indicator turns
on.
Heating zones hold at
your preset standby
temperatures.
Take the system out of
standby.
The STANDBY indicator turns
off.
Heating zones return to
your operating setpoint
temperatures.
Turn on the heaters. The HEATERS indicator turns
on.
The tank, hoses, and
guns are heated.
Turn off the heaters. The HEATERS indicator turns
off.
No heat is applied to
system components.
Turn on the 7-day clock.
The CLOCK indicator turns
on.
The system performs
functions controlled by
the clock.
Turn off the 7-day clock. The CLOCK indicator turns
off.
The system does not
perform functions
controlled by the clock.
Turn on the pump. The PUMP indicator turns on. The pump draws melted
material through the
system.
Turn off the pump. The PUMP indicator turns off. The pump stops drawing
melted material through
the system.
Determine whether a
fault was corrected.
All indicators turn on while
the system begins a
five-second test. At the end
of the test, the FAULT
indicator turns off.
The fault was corrected.
All indicators turn on while
the system begins a
five-second test. At the end
of the test, the FAULT
indicator stays on.
The fault was not
corrected.
Original copyright date 2000. FoamMelt, Nordson, and the Nordson logo are registered trademarks of Nordson Corporation.