EasyManua.ls Logo

Nortel DMS-250 - Test Equipment Requirements

Nortel DMS-250
390 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DS-1 configuration 2-9
Digital Switching Systems DMS-250 ISDN Reference Manual MWC14 (CSP14)
Table 2-4
DMS-250 switch settings
Distance to cross-connect
Switches closed
0 to 298 ft (0 to 101.6 m) SW1
298 to 449 ft (101.6 m to 153.0 m) SW2, SW5, SW7
449 to 656 ft (153.0 m to 223.6 m) SW3, SW6, SW8
Note:
SW4 is not used.
—end—
Test equipment requirements
The following describes useful equipment for commissioning a DS-1 trunk.
DS-1 line simulator
A DS-1 line simulator/monitor can be used to verify the integrity of the
DS-1 trunks between a DMS-250 switch and a PBX. The line simulator can
perform the following tasks:
• monitor a single path without being part of the primary path
• be included in the path between the two systems and operate in either a
transparent mode or provide its own stimulus to the trunk
• monitor the status of the trunk
• monitor the information in the channels
• simulate information in a given channel or an idle code in all channels
• simulate the alarms
Error counter
An error counter detects BPVs or no-signal periods for DS-1 trunks. The
fault detection and isolation procedures are performed using a Thor portable
test package. This test package consists of one of each of the following
items:
• Thor TTT2028 Mini Error Counter with an operation instruction card
• test cable equipped with a bantam plug at one end and minihooks at the
other end
• loopback plug with pin 3 shorted to pin 1 and pin 11 shorted to pin 9 (of
a 15-pin D-connector)

Table of Contents