Installation Wiring
14 ACPS-2406 PN 51304:B 09/02/2003
Figure 2.5 CAB-3 Cabinet: Power-limited Wiring Example
Figure 2.6 CAB-PS1 Cabinet: Power-limited Wiring Example
TB1 - With all power sources off, connect primary AC power to the “AC” and “NEUT” terminals,
and ground the ACPS-2406 at the “EARTH GROUND” terminal.
D54
D73
HOT N EUTRAL EARTH
D74
D47
TB5TB6TB 8
TB1
TB3
TB2
TB4
D40 D32
D66
OUTPUT 1 4 WIR E
O UT PUT 2 4 WIREOUTPUT 3
OUTPUT 4
SUP+ SUP-
UZC
+24V COMM +24V RETURN+24V COMM +24V RETURN
+24V COMM +24V COMM
SLCA SL CB
+ - + -
D67
F2
D68 D69
D70 D71
D72
D81
BAT T I N BA T T O U T BA T T IN B A T T O U T
OPTIONSOPTIONS
D75
+
+
__
8765432187654321
Output Circuit Wiring -
Power-limited
Supervised except for
TB6: UZCSUP+, UZCSUPRET-
TB1: AC Primary
Power Wiring -
nonpower-limited
and supervised.
acps6cab3wiring.CDR
D54
D73
HOT NEUTRAL EARTH
D74
D47
TB5TB6TB8
TB1
TB3
TB2
TB4
D40 D32
D66
OUTPUT 1 4 WIRE
OUTP UT 2 4 WIREOUTPUT 3OUTPUT 4
SUP+ SUP-
UZC
+24V COMM +24V RETURN+24V COMM +24V RETURN
+24V COMM +24V COMM
SLCA SLCB
+ - + -
D67
F2
D68 D6 9
D70 D7 1
D72
D81
BATT IN BATT OUT BATT IN BATT OUT
OPTIONSOPTIONS
D75
+
+
__
87 65432187654321
TB1: AC
Primary Power
Wiring -
nonpower-limited
and supervised.
Output Circuit Wiring - Power-limited
Supervised except for TB6: UZCSUP+, UZCSUPRET-
Two 12V, 7AH lead acid batteries will
fit into the CAB-PS1 enclosure with the
ACPS-2406. Do not use the
ACPS-2406 with batteries rated at
lower than 7 AH.
ACPS6CABPS1wiring.cdr
TB2: Non power-limited and supervised