ory and is to be installed in compliance with laws and standards in force in the country of instal
re approved and supplied by the manufacturer.
orrect boiler operation is not guaranteed when using accessories and
arts which are not manufacturer a
he boiler is shipped in a sturd
rom cardboard box and check its integrity.
materials can be recycled: disposal of must be mana
ed via specic waste collection sites.
children, as it may be source o
acturer shall not be held responsible
or damage to people, animals, or property due to
installation, use and maintenance manual;
) two screws and wall plu
s in order to afx the boiler to the wall;
model: one diaphragm for ue gas discharge
) in CTFS model: one sealin
hoosing where to install the boiler
ollowing must be taken into account when choosing where to install the boiler:
check the wall to be adequately well-built avoiding to
after the installation, check that 1 cm to the ri
ht and 1 cm to the left of the boiler was left for casin
Do not t the boiler above any equipment that may prejudice proper operation
steam and grease vapor emitting kitchen appliances,
s that may greatly reduce boiler li
espan.
3. INSTRUCTIONS FOR THE INSTALLER
3.1 INSTALLATION STANDARDS