EasyManua.ls Logo

Nova Florida VELA COMPACT - B) Minimum Heat Output Adjustment; C) Final Settings; 4. Testing the Boiler; 4.1 Preliminary Checks

Nova Florida VELA COMPACT
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
0
B)
Minimum heat out
p
ut ad
j
ustment
-
Disconnect electric wiring from D modulation coil
(
pic.
2
0)
;
-
turn t
h
e
b
urner on an
d
c
h
ec
k
m
i
n
i
mum pressure va
l
ue accor
di
ng to no.
2
an
d
no.
3
c
h
arts on page 1
4
;
-
in order to adjust pressure, hold nut B still b
y
means of a 100 mm tool, and turn plastic screw C CLOCKWISE to increase and
C
OUNTER-CLOCKWISE to decrease
g
as pressure;
-
re-connect electric wirin
g
to modulation coil.
C)
F
i
na
l
sett
i
ngs
-
Turn the boiler on and check its correct o
p
eration;
-
check a
g
ain for correct minimum and maximum
g
as valve pressure of
g
as valve;
-
a
dj
ust as necessary;
-
i
nsta
ll
protect
i
ve p
l
ast
i
c cap
A
;
-
close
g
as pressure checks;
-
check for
g
as leaks.
4
.
T
ES
TIN
G
THE
B
O
ILER
4
.1
P
re
li
m
i
nary c
h
ec
k
s
B
efore testin
g
the boiler, it is recommended to carry out the followin
g
checks:
-
ue gas evacuation ducts and terminal are implemented according to instruction:
wh
en t
h
e
b
o
il
er
i
s runn
i
ng
p
ro
d
ucts generate
d
b
y com
b
ust
i
on are not to
l
ea
k
f
rom gas
k
ets;
-
power mains suppl
y
to boiler is
23
0
V – 50 Hz
;
-
the system is correctly loaded (water pressure on
g
au
g
e 1 / 1,
3
bars
)
;
-
all stopcocks in the system pipin
g
are open;
-
the gas type supplied to the boiler is in compliance with boiler speci
cations In contrast, modi
f
y the boiler
f
or the gas type available
(
see no.
3
.
6 section “ADAPTATI
O
N T
O
O
THER
G
A
S
TYPE
S
AND BURNER ADJU
S
TMENT”
)
;
-
the
g
as supply stopcock is open;
-
no
g
as leaks are detected;
-
t
h
e power sw
i
tc
h
, externa
l
to t
h
e
b
o
il
er,
i
s on;
-
t
h
e
b
o
il
er
3
bar sa
f
ety valve is not blocked;
-
the boiler
p
um
p
is not blocked.
S
hould the boiler not be installed in com
p
liance with current laws and standards, notif
y
the s
y
stem su
p
ervisor
a
n
d
d
o not test t
h
e
b
o
il
er.
4.2.
S
witchin
g
on and switchin
g
off
F
or boiler starting up and switching o
ff
procedure
f
ollow the “Instructions
f
or the User”.

Table of Contents

Related product manuals