EasyManua.ls Logo

NPK PH4 - Page 25

Default Icon
75 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 24 -
LUBRICATION
HAMMER MOUNTED AUTO LUBE GREASE LINE PRE-FILLING
PRIMING THE GREASE LINE
6. Pump grease through the pump to the
grease line (29) until a steady stream
of grease (28) is realized at the
opposite (hammer) end.
6a. It is also possible to purge the grease
line to the hammer by disconnecting it
at the hammer then pumping grease
through the grease fitting provided on
the grease pump assembly.
7. Re-attach the grease line (29) to the
hammer (KK).
8. Pump twenty more shots of grease
using the grease gun (t37) or power
greaser into the pump assembly (FZ).
This will prime the hammer cavity and
pre-lube the tool.
9. Look for grease coming out around
the tool (HH) at the tool bushing (see
arrow).
NOTE: If the Auto Lube has run out of grease, the above procedure should be
used to purge all the air out of the line (29) before using the hammer.
Failure to do this will result in an intermittent supply of grease to the
hammer.

Table of Contents

Related product manuals