EasyManua.ls Logo

NPK PH4 - Weekly Inspection

Default Icon
75 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
- 47 -
WEEKLY INSPECTION
1. WELDS
Check for cracks, repair as necessary. Consult your authorized NPK Dealer or
NPK Service Department for additional information.
2. TOOL RETAINING PIN
Remove the retaining pin and inspect for peening caused by excessive blank
hammering. If necessary, grind edges smooth as shown in TOOL RETAINING PIN
INSPECTION, see page 57. The retaining pin must rotate freely.
3. DEMOLITION TOOL
Remove the demolition tool and inspect for peening caused by excessive blank
hammering. If necessary, grind edges smooth as shown in TOOL INSPECTION,
see page 54.
4. GAS CHARGE
Check and adjust, if required, see pages 59 through 64.

Table of Contents

Related product manuals