EasyManua.ls Logo

Nussbaum MCS 7500 User Manual

Nussbaum MCS 7500
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
MCS 7500 Flex RC Bluetooth
Date 01/2007
Manual date: 17.01.2007
Operating Instruction and Documentation
Serial number:...........................................
Nußbaum Hebetechnik GmbH & Co.KG//Korker Straße 24//D-77694 Kehl-Bodersweier
Tel: +49(0)7853/8990 Fax: +49 (0)7853/ 8787//
E-mail:info@nussbaum-lifts.de//http://www.nussbaum-lifts.de
Retailer address / phone
MCS 7500 Bluet E
01
-
07.doc
Question and Answer IconNeed help?

Do you have a question about the Nussbaum MCS 7500 and is the answer not in the manual?

Nussbaum MCS 7500 Specifications

General IconGeneral
BrandNussbaum
ModelMCS 7500
CategoryLifting Systems
LanguageEnglish

Summary

Foreword

Record of handing over

1. Introduction

1.1 Installation and check of the automotive lift

Guidance on installing and checking the automotive lift by specialist staff.

1.2 Information of Warning

Explanation of warning symbols used in the manual for safety and important notes.

2. Master document

2.1 Lift-manufacturer

Details of the lift manufacturer, Otto Nußbaum Hebetechnik GmbH & Co. KG.

2.2 Application

Description of the lift's intended use for raising heavy vehicles like trucks and buses.

2.3 Changes at the construction

Procedure for documenting changes to the lift's construction.

2.4 Declaration of conformity

Manufacturer's declaration that the lift complies with EC directives and harmonized norms.

3. Technical Information

3.1 Technical ratings

Specifications and ratings of the MCS 7500 mobile column lift.

3.2 Safety device

Overview of the various safety devices integrated into the lift system.

CE-STOP Functionality

Automatic lift stop before lowest position with acoustic warning signal.

Top-Limit Functionality

Computer control recognizes top height and switches off lift operation.

3.3 Datasheet

Detailed technical datasheet with dimensions and specifications.

4. Safety regulations

5. Operating instructions

5.1 Positioning of the columns

Guidance on correctly positioning the mobile lift columns for operation.

5.2 Putting into operation

Step-by-step instructions for powering up and preparing the lift system.

5.3 Lifting the vehicle (mode synchronous)

Procedure for lifting a vehicle using the lift in synchronous mode.

5.4 Lowering the vehicle (mode synchronous)

Procedure for lowering a vehicle using the lift in synchronous mode.

5.5 Single-Mode „Lifting“

Instructions for lifting a vehicle using a single lift column.

5.6 Single-Mode „Lowering“

Instructions for lowering a vehicle using a single lift column.

5.7 Axle-mode Operation

Operating the lift in axle mode for specific heavy part removal.

5.8 The key-operated switch function

Using the key-operated switch for service and disturbance handling.

5.9 Equalisation of the MCS

Procedure for equalizing the mobile columns after lifting or lowering.

6. Troubleshooting

6.1 Lowering on a obstacle

Procedure for safe removal of an obstacle when the lift is obstructed.

6.2 Emergency lowering

Step-by-step guide for emergency lowering by experienced personnel.

6.3 Reset the MCS after an emergency lowering

Process to reset the lift system after an emergency lowering procedure.

7. Inspection and Maintenance

7.1 Maintenance plan of the MCS

Scheduled maintenance tasks and procedures for the mobile column lift.

7.2 Cleaning of the MCS

Guidelines and frequency for cleaning the lift to ensure longevity and performance.

8. Security check

First security check before installation

Procedure for initial safety verification before the lift is put into operation.

Regular security check and Maintenance

Schedule and checklist for periodic safety inspections and maintenance.

Extraordinary security check

Procedure for verification after construction changes or major maintenance.

9. Handing over and Initiation

9.1 Regulations

Rules and requirements for installation and operation of the lift.

9.2 Initiation

Steps and responsibilities for putting the lift into service.

9.3 Position of the columns

Recommended placement and configuration of lift columns for operation.

Hydraulic diagram drawing

Hydraulic parts list

List of hydraulic components with descriptions and order numbers.

Electrical diagram drawing

Supply

Electrical supply connections and input points for the system.

Control voltage

Details regarding the 24V control voltage and associated circuitry.

Button

Diagram showing the lift operating buttons and their functions.

Sensors

Overview of the various sensors used in the lift system.

CONTROLLER

Schematic of the axis controller unit and its connections.

Bluetooth module

Diagram for the Bluetooth communication module and its interface.

Terminal diagram (+B-X1)

Terminal diagram for connection point +B-X1.

Terminal diagram (+B-XH)

Terminal diagram for connection point +B-XH.

Stückliste (Parts List)

Related product manuals