EasyManua.ls Logo

Nussbaum Sprinter NT - Page 20

Nussbaum Sprinter NT
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating Instruction and Documentation
Sprinter NT
- 20 -
abruptly lifting from the lowest position, unequal platform with load, not
complete lowering of a platform in the lowest position.
Right equalisation:
Assumption: One platform is higher than the other platform.
Measure:
Lower the lift in the lowest position. Press the button “lowering”.
Equalize the lift without load, otherwise the vehicle can mighty fall down.
Remove on the right side and the left side the covers of the operating unit.
pic. 2
Position X =
The bore hole in the cover is for the equalisation screw.
Loose the locknuts (SW17) of the equalisation screws A1 and A2 with a suitable
tool.
Open
slowly
the screw A1 and A2. Press the button “lowering” until both
platforms are on the lowest position.
During this process both platforms get balanced.
Further measure:
Close the equalisation screw A1 and A2 and safe it with the locknut.
Close after equalisation the screws A1 and A2 and the locknuts. Otherwise a
malfunction of the lift may occur.
Raise the lift in the upper end position. Press the button “lifting”
Open the screws A1 and A2.
Press the button "lowering". Lower the lift approx. 50 mm

Related product manuals