EasyManua.ls Logo

Oce PRISMAproduction - Test the PP;ROUTER Installation; ACCEPT the Product OS;390 (MVS)

Oce PRISMAproduction
139 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and Customization
U20944-J-Z247-6-7600
RTR0000E PRTnnnn: NO VALID LICENSE KEY, RESTRICTED MODE
ACTIVE LIMITED TO 3500 RECORDS,TRANSFER WILL TERMINATE.
The “License Key” can be obtained from your Océ representative. The CPUID for each
processor that PP/ROUTER is to be used on is required for the license key generation.
The CPUID can be displayed as follows:
OS/390 (MVS) MVS sytem command D M=CPU
Test the PP/ROUTER Installation
In order to test the installation start the print device that was defined in 2.7. Errors in router
table entries will be shown. Any router table groups that have missing required group
entries will be disabled.
In order to test the target destinations then test output datasets require to be transmitted.
ACCEPT the Product OS/390 (MVS)
A new release of PP/ROUTER should be allowed to run for a reasonable period of time in
production before doing an SMP accept. When the installation is confident that all print
jobs supported by the previous release of PP/ROUTER run without problems on the new
release, PP/ROUTER should be accepted.
//ACCEPT JOB 'ACCOUNT #','NAME',MSGLEVEL=(1,1)
//ACCEPT EXEC SMPPROC
//SMP.SYSIN DD * (SMPCNTL)
SET BDY(SPSvrmD) .
ACCEPT S(SPSvrm0) .
/*
Figure 14: Example SMP Accept Job

Table of Contents

Other manuals for Oce PRISMAproduction