EasyManua.ls Logo

Olympus UHI-2 - K-Connector Unit Assembly; 1 st Pressure Reducing Unit Assembly

Olympus UHI-2
38 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DISASSEMBLING/ASSEMBLING PROCEDURE
Disassembling
1. Remove the S-ring from the K-connector
with a spanner.
2. Remove the screw CCUK4x6SZ (4 pcs.)
which secure the K-connector unit.
Assembling
1. Secure the K-connector unit with the screw
CCUK4x6SZ (4 pcs.).
2. Fix the S-ring temporarily to the K-
connector unit.
Fix the S-ring after mounting the
electric pneumatic ratio valve.
3. Connect the harness to the UPUH15U J2.
Disassembling
1. Remove the S-ring from the 1st pressure
reducing unit with a spanner.
2. Remove the screw CCUK4x8SZ (4 pcs.)
which secure the 1st pressure reducing
unit.
Assembling
1. Secure the 1st pressure reducing unit with
the screw CCUK4x8SZ (4 pcs.).
2. Fix the S-ring temporarily to the 1st
pressure reducing unit.
3. Fix the S-ring completely to the 1st
pressure reducing unit.
4. Connect the tube from the electric
pneumatic unit.
CCUK4x8SZ
Connect to the
electric pneumatic
unit.
S-ring
3-6 1
st
pressure reducing unit
3-5 K-connector unit
CCUK4x6SZ
Connect to the
UPUH15U J2.
S-ring
Spanner
Philips screwdriver No. 2
Spanner
Philips screwdriver No. 2
Spanner
Philips screwdriver No. 2
3-5

Related product manuals