EasyManua.ls Logo

Omron HEM-7080 - Preparation for Use; Installing and Replacing Batteries

Omron HEM-7080
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
2. Preparation
2.1 Installing/Replacing the Batteries
1. Turn the main unit upside down.
2. Slide the battery
cover in the direction
of the arrow while
pressing the ribbed
part of the cover.
3. Install or replace four
AA size batteries
so that the +
(positive) and -
(negative) polarities
match the polarities
indicated on the
battery
compartment.
4. Put the battery cover back in place.
Slide the battery cover as indicated, until it clicks into place.
Note: The measurement values continue to be stored in
memory even after the batteries are replaced.
HEM-7080-C1_B_M.fm Page 9 Tuesday, March 9, 2010 9:05 AM

Related product manuals