133
Falcon+ Operator Manual
OPEX Corporation
A.1.3. Overall System Performance Measures Statistics
The table below lists the terms that appear in the Overall System Performance
Measures section of the statistics report.
Table 2: Overall System Performance Measures terms
Term Definition
Input Number of pieces fed into the machine.
Output
Number of pieces successfully processed by the machine.
This number is figured by subtracting the number of rejects
from the number of pieces input.
Jam Rate
Number of jams per run. The formula for the Jam Rate is:
Rejects Number of pieces rejected.
Feed Rate
Number of pieces per hour the Falcon+ is currently feeding.
The formula for the Feed Rate is:
Output Rate
Number of pieces per hour the Falcon+ is processing. The
formula for the Output Rate is:
Jam Clear
Time
Average time the Falcon+ was halted while the Operator
was clearing a jam. The formula for the Jam Clear Time is:
Reference
Feed Rate
Number of pieces fed into the Falcon+ per hour. The
formula for the Reference Feed Rate is:
Feed Rate =
Input * 6600
Active Job Time (seconds)
Output Rate =
Output * 6600
Active Job Time (seconds)
Jam Time (seconds)
Jam Clear
Jams
Time (seconds)
=
Reference Feed Rate =
Input * 6600
Run Time (seconds) + (Jams * Ref. Jam Clear Time (seconds))