Assembly
OPTIMUM
MASCHINEN - GERMANY
30 / 11 / 2007Page 26 Assembly Add-on kit D240/D280 ; Version 1.3.3
© 2007
GB
£ Center punch the marked out hole
for the housing of the Z axis with a
center punch.
£ Disassemble the housing and the
pulley from the spindle of the Z axis.
£ Drill holes 5mm for thread M6 x
10mm deep into the lathe bed.
Counter sink the holes with a coun-
ter sink.
Illustr.: 4-51: Mark out holes
£ Cut the thread into the lathe bed
with a screw tap M6.
£ Implicitly use oil for threading.
£ Always make sure that the threads
are cut straight.
£ Remove chips from the holes and
blow them out after threading.
Illustr.: 4-52: Cut threads
£ Grease the spindle of the Z axis and
then apply the retention agent "join
the shaft".
Illustr.: 4-53: Prepare spindle
Lathe bed
Center punch
Housing Z axis
Screw tap M6
90° angle
Lathe bed
Spindle Z axis
Retention agent
"join the shaft"