EasyManua.ls Logo

Optimum OPTIdrill B20 - Installation Diagrams B25, B32; First Commissioning

Optimum OPTIdrill B20
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Version 1.0.1 - 2020-07-2326 Translation of original instruction
B20 | B25 | B32
EN
B20-B25-B32_GB.fm
Img.3-10: Stand
ATTENTION!
Tighten the fixing screws of the drilling machine only as much that it is safely fixed and
cannot break away or tilt over.
If the fixing screws are too tight in particular in connection with an uneven substructure
it may result in a broken stand of the machine.
3.6.2 Installation diagrams B25, B32
3.7 First commissioning
WARNING!
Risk from using improper workpiece clamping materials or operating the machine at an
inadmissible speed.
Only use the tool holders (e.g. drill chuck) which were delivered with the machine or
which are offered as optional equipment by OPTIMUM.
Only use tool holders in the intended admissible speed range.
Tool holders may only be modified in compliance with the recommendation of OPTIMUM
or of the manufacturer of the clamping devices.
Through-bore
Arrow sign
B25
B32

Table of Contents

Related product manuals